• About Us
    • Buzz – Press Room
    • The Name
    • Disclaimer
    • Contact
  • Blog
  • The Experiment
    • Life at Moosicorn
    • Scenery
    • Videos
    • Fauna
    • Chickens
    • Trail Camera
  • Visit Moosicorn
    • B&B
    • Artist in Residence
  • General Store

Blog

« Exterior Design Work

Tweet

Skirting Progress, Knee Braces Installed

Posted by Scott on 07 Sep 2009 / 0 Comment

I made it out to the property this weekend, sans Al. She was missed dearly, but Sadie and I did manage to have quite a bit of fun and get some work done to boot. Construction progress since the last trip included: the galvanized skirting was installed (mostly) and the knee braces are up! See how it compares to the original design concepts here.

Leave A Reply





  Cancel Reply

« Exterior Design Work

  • Categories

  • So far our chickens have produced…

  • Featured Posts

    Chicken Coop Tour
    Green at Heart
    Filmed in Spokane
  • Latest Flickr Images


  • Recent Twitter Posts

    • MoosicornRanch: @JaneTanfei Thank you for that! We hope to catch a performance of yours some time
    • MoosicornRanch: Meet our queen bee http://t.co/KLVSZl8p
    • MoosicornRanch: @Toadsp ha! That's sort of creepy, Toad.
    • MoosicornRanch: Good one ha ha RT @JacobinPA #ornithyougladIdidntsaybanana
    • MoosicornRanch: What do you think? http://t.co/RKmPJqtL yellow or orange crowned warbler? #birding #wildlife #nature



All photos taken by us, unless otherwise mentioned, some rights reserved. Thank you for visiting!